Showing posts with label road conditions. Show all posts
Showing posts with label road conditions. Show all posts

13 August 2026

Kruger National Park Road Conditions: A self-drive guide for visitors

Update - 07 September 2026: One of Kruger National Park's busiest tourist routes, the H4-1 Road between Skukuza and Lower Sabie, has been reopened following flood-related damage and closure. The rebuild culverts were unveiled on 06 September 2026. 

Update – 28 August 2026: There is some encouraging progress for travellers affected by the R531 Orpen Road closure. Work has begun on a temporary detour around the flood-damaged section of road, with clearing and grading reportedly underway.

The detour is being developed as an interim solution to restore easier access between Hoedspruit and Kruger National Park's Orpen Gate. However, it is not yet open to public traffic, and visitors should continue to use the currently available alternative routes until an official opening is announced.

The new detour could provide significant relief for self-drive visitors and the tourism businesses around Orpen Gate once completed. We will update this post as soon as its opening date and traffic arrangements are confirmed.

Kruger Road Network Update – 27 August 2026: SANParks has published an updated Kruger Roads Register (27 August 2026), providing the latest information on road conditions, closures, restrictions and diversions across Kruger National Park.

update (19 August 2026): SANParks is urging visitors to respect road closures in Kruger National Park and never remove or drive around “No Entry” signs or barriers.

According to SANParks, some visitors have deliberately opened closed roads and subsequently become stranded, requiring search-and-rescue operations involving rangers and, in some cases, aircraft. Apart from putting themselves and rescue teams at risk, vehicles using closed roads can cause further damage to roads already affected by wet weather.

Visitors who deliberately bypass a road closure may face fines and could be held responsible for costs arising from search-and-rescue operations. SANParks also points out that driving on closed roads is a contravention of the National Environmental Management: Protected Areas Act.

With mobile-phone coverage limited in parts of Kruger, getting stranded on a closed road can quickly become a serious situation. If a road is closed, do not attempt to find a way through — follow the official diversion or ask SANParks staff for an alternative route.  

Kruger Road Network Update – 15 August 2026

SANParks has published an updated Kruger Roads Register (14 August 2026), providing the latest information on road conditions, closures, restrictions and diversions across Kruger National Park

Kruger Road Network Update – 13 August 2026

SANParks has published an updated Kruger Roads Register (11 August 2026), providing the latest information on road conditions, closures, restrictions and diversions across 
Kruger National Park

Updated: August 2026

The Kruger National Park road network is one of the reasons the park works so well for a self-drive safari. More than 2,000 kilometres of designated tourist roads cross the park, ranging from major tar roads connecting the main camps to smaller gravel routes that take visitors deeper into the bush.

The network, however, has had a difficult year.

Exceptional rainfall and flooding in January 2026 caused significant damage to roads, bridges, causeways and drainage infrastructure in Kruger National Park. Although access has progressively been restored, the effects of the floods continue to influence road conditions in some parts of the park.

For travellers planning a Kruger National Park self-drive safari in the coming months, the situation is therefore worth understanding — particularly if your itinerary includes the northern part of the park or relies heavily on gravel roads.

How extensive is Kruger's road network?

Kruger National Park has an extensive network of roads available to visitors.

According to South African National Parks (SANParks), the park has more than 850 kilometres of tarred roads and approximately 1,444 kilometres of gravel roads. These are the roads that make up the visitor-accessible tourist network.

The network can broadly be divided into:

  • Tar roads, which form the main links between entrance gates, rest camps and other major destinations.
  • Gravel tourist roads, which provide access to quieter areas and many of the park's best self-drive game-viewing routes.
  • Specialist routes, such as 4x4 Eco Trails, which operate under separate conditions and should not be confused with the normal tourist-road network.

Kruger National Park's firebreaks are not part of the tourist road network. Visitors may not use them as alternative routes.

What did the 2026 floods do to Kruger's roads?

The January 2026 floods were exceptional and caused extensive damage in several parts of the park.

Heavy rainfall left catchments saturated and resulted in rapidly rising rivers. Roads were damaged or washed away, bridges and causeways were affected and access to some camps was temporarily disrupted.

The impact was particularly serious in the central and northern sections of Kruger National Park. Even after the initial flooding had subsided, the saturated catchments remained vulnerable to renewed rises in river levels.

SANParks was still reporting flooding-related access problems in the north in March, noting that rivers in the Shingwedzi and Luvuvhu systems were rising and that the catchments remained extremely saturated following the exceptional January rainfall.

This is important because the effects of such flooding are not limited to the immediate aftermath. Damaged culverts, bridge approaches, road surfaces and drainage structures can require months of repair.

Has Kruger's road network reopened?

Much of the network has reopened and normal visitor access has resumed, but this should not be interpreted as meaning that every individual road has returned to its pre-flood condition.

SANParks has restored access in stages as roads and infrastructure were assessed and repaired.

A good example is the H7 between Orpen Gate and Satara. The road reopened after flood damage, but the section around Nsemani Dam was initially restricted to a single lane because of significant damage. SANParks also constructed a bypass using the S12 and S40 while work continued.

In the north, Shingwedzi Rest Camp reopened in March, but access arrangements initially remained restricted while repairs were carried out on the approach to the Letaba high-water bridge.

These examples illustrate the current situation well: Kruger National Park is open, but infrastructure recovery is an ongoing process rather than a single reopening event.

Tar roads: the backbone of a Kruger safari

For most visitors, the tar roads remain the easiest way to travel between the major camps.

They provide the principal connections through the park and are generally suitable for ordinary passenger vehicles. SANParks sets the speed limit at 50 km/h on tar roads.

But tar does not necessarily mean "unaffected by weather".

Many of Kruger National Park's tar roads cross rivers or seasonal streams, and a bridge or causeway can become the limiting factor after heavy rain. The January floods showed how quickly a normally straightforward route can become impassable.

Travellers should therefore think of the road and its crossings as one system.

Gravel roads: an important part of the safari experience

The gravel-road network is arguably even more important to safari enthusiasts.

These roads allow visitors to get away from the main traffic corridors and explore quieter sections of the park. They also provide access to many loops and connecting routes that make it possible to design a full day's game drive without simply travelling between camps.

SANParks describes the visitor road network as consisting of tarred and good gravel roads, with a 40 km/h speed limit on gravel roads.

Following the January floods, however, gravel roads were particularly vulnerable to washaways and erosion. SANParks temporarily closed large sections of the gravel network during the worst conditions and progressively reopened routes as conditions improved.

Visitors should therefore not assume that an old road-status list found online still applies.

A gravel road that was closed in January or March may have reopened, while another route may subsequently have been restricted because of maintenance or weather.

River crossings remain the weak points

For travellers, the most important legacy of the floods is probably the condition of bridges, causeways and river crossings.

These are the places where a road can suddenly become unusable after rainfall.

The problem is not necessarily rainfall directly over the road. Rain falling elsewhere in a river's catchment can result in a rapid rise in water levels downstream.

This is particularly relevant in the northern part of Kruger National Park, where the Shingwedzi and Luvuvhu river systems were among those affected during the 2026 floods.

The rule for visitors is straightforward:

Never attempt to cross a flooded or submerged road, causeway or bridge.

If SANParks closes a road, do not drive around a barrier or ignore a "No Entry" sign. SANParks explicitly states that driving off-road or using roads marked "No Entry" is prohibited.

Can ordinary cars use Kruger's gravel roads?

Yes.

A 4x4 is not normally required for a self-drive safari in Kruger National Park. The designated tourist gravel roads are intended for ordinary visitor vehicles under normal conditions.

A 4x4 does not, however, give a visitor permission to use a closed road or drive off the designated network.

The situation is different for specialist activities such as 4x4 Eco Trails, which have their own rules and access arrangements.

What vehicles are restricted?

There are several important vehicle restrictions for visitors.

SANParks states that:

  • Caravans and trailers are restricted to tar roads.
  • Coaches and buses are restricted to tar roads.
  • Vehicles with an axle load exceeding 8,000 kg are not permitted.
  • Motorcycles are not permitted.
  • Vehicles with a carrying capacity exceeding 4,000 kg, buses and vehicles with more than 25 seats are restricted to tar roads.

This matters when planning a Kruger National Park itinerary with a caravan or larger vehicle. A route shown on a map is not necessarily suitable for every type of vehicle.

What can visitors expect over the coming months?

The outlook changes as Kruger National Park moves from the dry winter season towards spring and summer.

August

August is normally part of the dry season, which generally means more favourable road conditions. The absence of widespread summer rainfall reduces the immediate risk of flood-related road closures.

However, the infrastructure damage from earlier in the year does not disappear simply because conditions are dry. Visitors should continue to check their intended routes, particularly where repairs or bridge work have been necessary.

September

September is the month when travellers should start paying more attention to the weather again.

The first thunderstorms of the approaching summer rainy season can occur, although rainfall is typically still far less persistent than later in the season.

For most visitors this should not be a reason to change a Kruger National Park itinerary. It does mean that road conditions can become more variable, particularly on gravel roads and at low-water crossings after significant rainfall.

The experience of 2026 has also demonstrated why this matters: Kruger National Park's river systems can respond rapidly when catchments are already saturated.

October and beyond

As the summer rainfall season becomes established, the possibility of temporary road closures increases.

This does not mean that Kruger National Park becomes inaccessible. Rather, visitors should expect a greater possibility of localised closures, damaged gravel sections and temporary restrictions at river crossings after heavy rain.

The park's enormous road network usually provides alternative routes, but travellers should allow sufficient time and avoid building an itinerary that depends on one particular minor road being open.

What should self-drive visitors do?

A few simple precautions make a big difference.

Check the latest road information before setting out. Ask at your rest camp or entrance gate about conditions on the route you intend to use.

Do not rely on an old road-closure list. Conditions can change, and information published during the January floods is no longer necessarily relevant.

Allow extra time for long drives. A temporary closure or detour can add considerable distance.

Watch the weather forecast.
This becomes increasingly important from September onwards.

Treat river crossings with caution. Never drive through flowing or rising water.

Respect every road closure. SANParks warns that driving on a closed road or a road marked "No Entry" is an offence.

Stay on the designated tourist network. Off-road driving is prohibited, even if a particular track appears to provide a shortcut.

Bottom line

The Kruger National Park road network is operational and remains perfectly usable for self-drive safaris, but 2026 has demonstrated just how quickly weather can affect travel inside the park.

The January floods caused serious damage to roads, bridges and drainage infrastructure, particularly in the central and northern parts of Kruger National Park. SANParks has progressively restored access, but some infrastructure work and localised restrictions remain part of the picture.

For travellers, there is no need to avoid Kruger National Park because of the floods. Instead, plan with a little flexibility.

The main tar roads provide reliable connections between the major camps, while the extensive gravel network offers the freedom and adventure that make a Kruger National Park self-drive so rewarding. From September onwards, however, keep a closer eye on rainfall and be prepared for temporary changes, particularly around river crossings and on minor gravel roads.

The most important advice remains simple: check the latest SANParks information before every long drive, follow all temporary restrictions and never attempt to bypass a road closure. 

 

 

Subscribe for updates:

Subscribe to our newsletter for weekly updates, border info, road alerts, and travel inspiration for Southern Africa. 

06 July 2026

Mozambique Travel Update July 2026: Post-flood recovery and tourism conditions

Mozambique continues its gradual recovery following the severe flooding that affected large parts of the country during the 2025/26 rainy and cyclone season. While the peak disaster phase has passed, the situation on the ground remains uneven: some tourism regions are fully operational again, while others are still dealing with infrastructure repairs, seasonal access disruptions, and lingering vulnerabilities in low-lying coastal and riverine areas.

This update provides a traveller-focused overview of current conditions, based on recent recovery reporting, humanitarian assessments, and tourism-sector reopening trends.

Flood impact recap: What happened earlier in 2026

Between January and March 2026, Mozambique experienced widespread flooding driven by prolonged heavy rainfall and river overflow in major basins including the Limpopo and Incomáti systems. The impact was substantial:

  • Over 600,000–800,000 people affected during peak phases of the disaster
  • Large-scale displacement, with tens of thousands housed in temporary accommodation centres at the height of the emergency
  • Extensive damage to roads, bridges, housing, and local infrastructure
  • Temporary disruption to transport corridors linking southern coastal regions and inland provinces
  • Periodic access constraints in parts of Gaza, Maputo, Sofala, and Inhambane provinces

While emergency response operations stabilised the situation by March 2026, recovery has continued through the dry-season transition period.

Current situation (July 2026): Recovery phase in progress

Mozambique is no longer in an active flood emergency phase, but it is also not yet fully “business as usual” across all regions.

What has improved

  • Major floodwaters have largely receded in coastal tourism zones
  • Primary transport routes are generally open, with some repair zones
  • Airports and key aviation infrastructure are operating normally with no nationwide disruption
  • Tourism corridors to major destinations are functioning again, especially along the coast

What remains affected

  • Secondary and rural roads in flood-prone districts may still be uneven or partially degraded
  • Occasional localised flooding can still occur after heavy rain, especially in low-lying areas
  • Some community infrastructure (bridges, drainage, access roads) is still under repair
  • Service capacity in rural tourism areas can be inconsistent due to ongoing recovery pressures

In practical terms: travel is possible, but flexibility is still advisable outside major hubs.

Coastal tourism areas: What’s open vs what to expect

Maputo & Southern Coast (Macaneta, Ponta do Ouro, Xai-Xai)

  • Coastal tourism is largely operational again
  • Beach lodges and resorts have resumed normal operations in most areas
  • Road access from Maputo is generally open, though some stretches may show wear from flood damage
  • Xai-Xai and surrounding coastal zones have recovered significantly, but infrastructure strain is still visible in places

Inhambane Province (Tofo, Barra, Vilanculos corridor)

  • One of the most resilient tourism regions during recovery
  • Flights and road access are operating normally
  • Dive tourism and beach lodges are active again
  • Minor seasonal road deterioration possible in rural feeder roads

Central Mozambique (Sofala, Beira region)

  • Recovery is ongoing in urban infrastructure and transport links
  • Tourism is more limited compared to southern coastal hubs
  • Travellers should expect variable service reliability outside Beira itself

Roads, transport & overland travel conditions

Road infrastructure in Mozambique was one of the hardest-hit sectors during the floods, particularly along river basins and low-lying corridors.

Current status:

  • Main highways (including EN1 sections) are generally passable again
  • Some repaired sections remain vulnerable to heavy rain or washouts
  • Rural detours may still be required in isolated cases
  • Night driving in less-developed regions remains inadvisable due to road conditions and visibility risks

Key takeaway: Overland travel is functioning again, but not yet fully resilient.

Flights & border access

  • International flights to Maputo, Vilanculos, and other tourism gateways are operating normally
  • No national aviation restrictions remain in place
  • Regional air connections continue to provide the most reliable access to remote coastal destinations
  • Border crossings with South Africa (e.g. Komatipoort corridor) are open, with normal procedures

Air travel remains the most stable entry option for tourists during ongoing infrastructure recovery.

Hotels, lodges & tourism services

The tourism sector in Mozambique has broadly reopened following early 2026 disruptions:

  • Coastal resorts and safari lodges are operating again across major destinations
  • Booking availability is generally good outside peak holiday periods
  • Some smaller operators are still rebuilding staffing levels and logistics chains
  • Prices in some areas remain slightly elevated due to ongoing supply chain recovery

Overall, Mozambique's tourism industry is functioning, but still normalising after the flood shock.

Safari areas & inland parks

  • Wildlife tourism areas were less directly affected than coastal flood zones
  • Access routes to parks have largely been restored
  • Seasonal conditions are now more influenced by dry-season travel patterns than flood impacts
  • Some remote parks may still experience infrastructure constraints after earlier rainfall damage

No national parks in Mozambique remain fully closed to tourism as a result of the 2026 floods. However, Limpopo National Park continues to experience recovery-related access variability in parts of its internal road network, while all other major parks are operational with standard seasonal considerations. 

Travel conditions overview (July 2026)

Well-established tourism zones (stable conditions)

Areas with variable conditions (recovery & infrastructure sensitivity)

  • Rural Inhambane and Gaza hinterland
  • Secondary roads and river crossings
  • Remote inland tourism routes

Practical travel considerations

  • Localised disruptions may still occur after heavy rainfall
  • Infrastructure recovery varies by district and municipality
  • Travel insurance with disruption coverage is recommended
  • Flexible routing is advisable for self-drive itineraries

Climate & seasonal outlook

Mozambique remains highly exposed to cyclical weather extremes:

  • The country is entering a pattern of increasingly volatile rainy seasons
  • Flood risk remains concentrated in river basins and coastal plains
  • Cyclone activity continues to influence southern Indian Ocean weather systems
  • Infrastructure resilience is improving but still uneven

For travellers, this means Mozambique remains a high-reward but climate-sensitive destination, especially during and immediately after the rainy season.

Bottom line for travellers

Mozambique in mid-2026 is best described as:

Open for tourism, operational, and welcoming visitors again — but still in active recovery from earlier flood damage.

If you are planning travel:

  • Coastal destinations are largely safe and operational
  • Transport infrastructure is mostly restored but not fully hardened
  • Flexibility remains the most important travel strategy
  • Conditions improve significantly the further you stick to established tourism corridors

 

Subscribe for updates:

Subscribe to our newsletter for weekly updates, border info, road alerts, and travel inspiration for Southern Africa. 


27 May 2026

Mozambique Travel Update May/June 2026: Flood recovery, road conditions & tourism outlook

update 26 June 2026

Travellers heading to Mozambique should be aware that reports of partial or temporary fuel shortages have emerged at some filling stations in recent days, raising concerns among motorists in several parts of the country. Mozambique's Energy Regulatory Authority (ARENE) has confirmed that isolated cases of fuel unavailability have occurred and says it is working closely with fuel operators and other relevant authorities to determine the causes and assess the impact on the market. ARENE has stated that the situation is being closely monitored and that measures are being implemented to restore normal supply conditions. While there is currently no indication of a nationwide fuel crisis, travelers planning self-drive trips in Mozambique are advised to keep their fuel tanks topped up and allow for extra flexibility in their travel planning 

update 22 June 2026

Mozambique's winter high season is now in full swing, offering ideal, dry conditions for beach holidays, diving, and marine safaris across major coastal hubs. The country has successfully moved past the emergency flood phase, with key gateways like Maputo, Tofo, Vilanculos, and the Bazaruto Archipelago operating normally and accessible via stable domestic flights. While the vital EN1 highway remains fully open and operational, self-drive travellers should still plan for extra travel time to navigate ongoing infrastructure rehabilitation, localized road repairs, and occasional detours in previously affected rural sectors. 

update 16 June 2026

Mozambique's recovery from the severe floods that affected parts of the country earlier this year has continued steadily throughout June 2026. While reconstruction work remains ongoing in some flood-affected areas, the country has largely moved beyond the emergency response phase and is now focused on rebuilding infrastructure and supporting economic recovery. The vital EN1 highway remains open and operational, although travellers should still expect occasional roadworks, repaired bridges and temporary speed restrictions in sections damaged by the floods. Encouragingly for visitors, no major tourism destinations are currently closed due to flood-related damage, and popular destinations such as Maputo, Tofo, Vilanculos, the Bazaruto Archipelago and Gorongosa National Park continue to welcome travellers.

The start of the southern African winter has also ushered in Mozambique's peak tourism season, bringing dry weather and favourable conditions for beach holidays, diving, snorkelling, dhow cruises and self-drive adventures. As a result, flood-related travel disruptions have become increasingly rare. For many international visitors, the most important travel consideration in 2026 is now Mozambique's electronic travel authorisation (ETA) system and ensuring all entry requirements are met before departure. Although signs of the floods remain visible in some rural communities and reconstruction projects continue across parts of the country, tourism infrastructure is functioning well and the overall travel outlook for Mozambique has improved significantly compared to the beginning of the year.  

---------- 

Several months after severe flooding disrupted large parts of Mozambique, the country’s tourism sector is steadily recovering — but conditions still vary considerably depending on where and how you travel.

The good news for travellers is that most mainstream tourism destinations remain accessible, international flights are operating normally, and coastal tourism has rebounded strongly ahead of the southern African winter season. Beach resorts, island lodges and marine tourism operators are again welcoming international visitors, particularly in southern and central Mozambique.

However, flood damage earlier this year exposed once again how vulnerable Mozambique’s infrastructure remains to extreme weather events. While many emergency repairs have already been completed, some inland roads and overland routes continue to experience disruptions, slower travel times and ongoing rehabilitation works.

For travellers planning a Mozambique trip in 2026, the key is understanding that the situation is highly regional rather than uniformly problematic.

What happened in Mozambique earlier this year?

Between late 2025 and early 2026, heavy rainfall, overflowing river systems and tropical weather systems caused extensive flooding across parts of southern and central Mozambique.

The floods affected transport infrastructure, damaged sections of the EN1/N1 highway, disrupted supply chains and temporarily isolated several communities. Gaza Province, sections of the Limpopo basin and parts of the south were particularly affected.

Tourism was impacted primarily through:

  • road closures and damaged bridges
  • slower overland transport
  • interruptions to fuel and supply logistics
  • temporary access challenges for some lodges and beach destinations
  • flight schedule adjustments during the peak of the crisis

The situation today is far more stable than during February and March, but recovery remains ongoing in several regions.

Is Mozambique open for tourism now?

Yes. Mozambique is fully open for tourism, and most international travellers visiting established tourism areas are encountering relatively normal travel conditions.

The strongest recovery has taken place in:

These areas continue receiving international visitors and are largely functioning normally from a tourism perspective.

The reality on the ground is currently very different from the emergency headlines seen earlier this year.

Flights and airport operations

Air access remains the easiest and most reliable way to travel within Mozambique in 2026.

International flights into Maputo are operating normally, while domestic services to tourism destinations such as Vilanculos and Inhambane have stabilised considerably compared to the early flood period.

Fly-in holidays are currently far easier and more predictable than long-distance self-drive itineraries.

This is especially relevant for travellers heading to:

Many tourism operators have adapted by prioritising aviation-based logistics and airport transfers over complex road transport.

Road conditions and self-drive travel

Self-drive travel has improved significantly since the floods, but road conditions remain inconsistent.

The EN1/N1 — Mozambique's crucial north-south transport artery — suffered major flood damage earlier this year. Emergency repairs have restored connectivity in many areas, although some sections still experience temporary repairs, uneven surfaces, detours and slower traffic movement.

Travellers driving in Mozambique during 2026 should expect:

  • longer journey times
  • occasional construction zones
  • potholes and degraded surfaces
  • localised flood damage
  • possible weather-related disruptions after heavy rain

Driving after dark remains strongly discouraged due to road safety concerns, limited lighting and accident risks.

For overland travellers from South Africa or Eswatini, careful route planning remains essential.

Best destinations to visit right now

Maputo

Mozambique’s capital remains fully operational as the country’s main aviation and tourism gateway.

Hotels, restaurants, cafés and urban tourism services are functioning normally, although travellers should continue following standard big-city safety precautions regarding theft and petty crime.

Tofo and Inhambane

The Inhambane coastline has emerged as one of the country’s strongest tourism recovery areas.

Diving, surfing, whale shark excursions and beach holidays are operating again, with many travellers reporting relatively smooth experiences throughout the region. Tourism operators have benefited from improved road access and stable flight operations.

Vilanculos and Bazaruto

Vilanculos and the Bazaruto Archipelago remain among Mozambique's most attractive tourism success stories in 2026.

The region’s dependence on air access rather than long overland transport has helped tourism recover faster than in some inland regions. Island resorts, dhow cruises, snorkelling and marine tourism activities are operating normally again in most cases.

Gorongosa and safari tourism

Safari tourism is recovering more gradually than coastal tourism.

Gorongosa National Park continues operating and remains one of Africa’s most important conservation tourism projects, but overland access conditions can still fluctuate depending on weather and road maintenance.

Travellers visiting remote parks should confirm transfer logistics and route conditions directly with operators before departure.

Safety and security in Mozambique

The overall security picture in Mozambique remains mixed and highly regional.

Southern and central Mozambique

The majority of mainstream tourism routes are located in southern and central Mozambique, where travel generally continues without major security disruptions.

Most international advisories currently classify these areas under “exercise increased caution” guidance due to crime, civil unrest risks and infrastructure limitations rather than active conflict.

Cabo Delgado and northern Mozambique

The security situation in Cabo Delgado remains Mozambique's biggest long-term tourism challenge.

Insurgency-related violence linked to Islamist militant groups continues in parts of northern Mozambique, and most governments still advise against travel to the region.

While security operations involving Mozambican, Rwandan and regional forces have improved stability in some districts, the situation remains volatile and unpredictable.

This primarily affects:

  • Cabo Delgado Province
  • Quirimbas region tourism
  • some northern safari operations
  • remote northern coastal itineraries

Importantly, these areas are geographically far removed from the mainstream tourism regions most international visitors use.

Health and travel infrastructure

Mozambique's healthcare infrastructure remains limited outside major cities, and flood recovery efforts continue placing pressure on local systems in some areas.

Travellers should strongly consider:

  • comprehensive travel insurance
  • medical evacuation cover
  • flexible itineraries
  • offline maps and navigation
  • backup payment methods
  • extra travel time buffers

Border crossings and airports are operating normally, although regional health screening measures remain possible in southern Africa due to broader regional disease-monitoring protocols.

So, should you travel to Mozambique in 2026?

For most travellers, yes.

Mozambique is no longer dealing with a nationwide flood emergency, and many tourism areas are functioning surprisingly well considering the scale of the earlier disaster. Coastal and fly-in tourism has recovered far faster than many expected, while self-drive tourism is steadily improving month by month.

Travellers who remain flexible, monitor conditions carefully and focus on established tourism regions can still enjoy one of Africa’s most rewarding beach and marine destinations in 2026.

The key takeaway is simple: Mozambique is open, recovering and increasingly accessible again — but successful travel currently depends far more on smart planning and regional awareness than it did before the floods.

 

Subscribe for updates:

Subscribe to our newsletter for weekly updates, border info, road alerts, and travel inspiration for Southern Africa.  

26 January 2026

Mpumalanga road conditions: SANRAL issues flood damage update!

last update 26 January 2026 

The South African National Roads Agency SOC Limited (SANRAL) has released an updated status report on national roads affected by recent heavy rainfall and flooding in Mpumalanga, warning road users to exercise extreme caution while recovery and assessments continue.

According to SANRAL Mpumalanga Provincial Head Mabuyi Mhlanga, the agency is actively monitoring flood-affected routes and conducting on-site assessments wherever conditions allow.

“These assessments form part of SANRAL’s ongoing efforts to ensure the safety of all road users. In areas where it remains unsafe to operate, inspections will resume once floodwaters have fully subsided. Our Routine Road Maintenance (RRM) teams remain on standby,” said Mhlanga.
SANRAL has urged motorists to reduce speed, maintain safe following distances, and avoid driving through flooded sections, as water depth and underlying road damage may not be visible. 

Affected National Roads in Mpumalanga

  • Nkomazi Local Municipality
    • R582 (Section 1) – Coopersdal Road from the N4 to the R571 intersection
      The Komati River Bridge was overtopped, resulting in road damage.
      One-way traffic flow is currently in place.
  • Thaba Chweu Local Municipality
    • R37 (Section 4) – Sabie/Nelspruit intersection to Mbombela border
      Damage recorded between Km 24 (Brondaal old pump station) and Km 28, including three slip failures.
      Two-way traffic flow is being maintained.
    • R36 (Section 3) – Between Lydenburg and Bambi
      Severe pavement deterioration reported along this section.
  • Mbombela and Bushbuckridge Local Municipalities
    • R40 (Section 1) – At the Bulembu Border
      Drainage and structural failures identified.
      One-way traffic flow in operation.
    • R40 (Section 4) – Between White River and Hazyview
      • Km 19.4: Slip failure and culvert collapse
      • Km 27: Slip failure and culvert collapse
      • Contractors are currently on site at both locations.
    • R40 (Section 5)
      • Km 30.4 (Bushbuckridge to Dwarsloop): 24-hour stop-and-go traffic control in place
      • Km 45 (Acornhoek to Dullstroom): Slip failure and culvert damage; two-way traffic maintained
      • Km 50.4 (Dwarsloop to Acornhoek): 24-hour stop-and-go traffic control in effect

Travel advisory for Mpumalanga
SANRAL continues to monitor conditions across the province and will issue further updates as assessments progress and repairs are undertaken. Travellers to and within Mpumalanga - particularly those heading to Kruger National Park, Hazyview, White River, and surrounding tourism areas - are advised to plan routes carefully and allow extra travel time.

Motorists should stay informed via official SANRAL communication channels and avoid non-essential travel through flood-affected areas where possible.

 

Subscribe for updates:

Subscribe to our newsletter for weekly updates, border info, road alerts, and travel inspiration for Southern Africa

22 January 2026

Botswana issues travel advisory for Chobe National Park roads!

Chobe Road Conditions Update – April 2026

Road conditions in Chobe National Park remain challenging following the severe flooding reported earlier this year. Above-average rainfall across northern Botswana has delayed recovery, and several key routes—particularly the Mababe–Savuti Marsh Road—are still impassable. Alternatives such as the Sand Ridge Road and the Pimple Hill route are open but heavily degraded, with deep mud, standing water, and difficult driving conditions. While some sections have begun to dry out, “open” roads should not be mistaken for easy access, and self-drive travellers continue to require high-clearance 4x4 vehicles, recovery equipment, and preferably convoy support. At this stage, fly-in lodge access remains the most reliable option, and meaningful improvements to road conditions are only expected as the dry season progresses through May and June 2026. 

last update 22 January 2026 

The Botswana Ministry of Environment and Tourism, through the Department of Wildlife and National Parks (DWNP), has issued an important advisory regarding current road conditions in and around Chobe National Park following widespread heavy rainfall.

Recent downpours have resulted in deep standing water, muddy tracks, and severely degraded access routes, particularly in the Mababe, Savuti, Ghoha and Linyanti regions. Self-drive visitors are urged to plan routes carefully and strictly follow official guidance to ensure safety.

Mababe – Savuti Routes

  • Marsh Road: Closed. Do not attempt to use this route under any circumstances.
  • Sand Ridge Road: Open, but significantly affected by deep water puddles.
  • Solo travel and single-vehicle convoys are strongly discouraged.

Savuti – Ghoha Routes

  • Airstrip Route: Affected by deep water.
  • Direct (Straight) Route: Also waterlogged but currently in better condition than the Airstrip Route.
  • Pimple Hill Route: Recommended route.
    • This track is narrower, less flooded, and requires extra caution. The route is available on Google Maps.

Access to Linyanti

  • Ghoha – Linyanti Park Boundary Road: Closed due to high-risk conditions.
  • Alternative access: Visitors should use the Savuti – Linyanti Road only.

Mababe Gate – Mababe Village / Moremi Access

  • Upon exiting Mababe Gate, take the right-hand turn to join the Maun–Khwai Access Road.
  • The Maun–Khwai Access Road is currently in poor condition; drivers should proceed with extreme caution.

Important safety notice for tourists

All visitors travelling in these remote areas must have 24-hour emergency communication, such as a satellite phone or equivalent device. Recovery services may be delayed due to road conditions and weather.

Travellers are advised to monitor official updates from the Department of Wildlife and National Parks (DWNP and to adjust itineraries where necessary. Conditions may change rapidly depending on further rainfall.

About Chobe National Park

Chobe National Park is one of Botswana's premier safari destinations and forms a critical part of the country’s northern conservation network, linking the Chobe Riverfront, Savuti, Linyanti and Nogatsaa regions. Renowned for its vast elephant population, diverse wildlife habitats and seasonal floodplains, the park attracts both guided and self-drive visitors year-round. During the rainy season, however, access routes within Chobe National Park can deteriorate rapidly, making up-to-date road condition information essential for safe travel planning. 

 

Subscribe for updates:

Subscribe to our newsletter for weekly updates, border info, road alerts, and travel inspiration for Southern Africa. 

20 March 2025

Namibia flooding update: Roads to avoid & current conditions! [update #13]

update (25 April 2025) The Namibian Roads Authority (RA) has announced the completion and official opening of the newly constructed two-lane bypass on the Windhoek-Rehoboth road (B1). Motorists are advised to exercise caution as they familiarize themselves with the new route and to follow all road signage and speed regulations.

update (25 April 2025) The RA announced yesterday that the construction of a 2-lane bypass at the Aris Bridge (Windhoek-Rehoboth) is progressing well, after heavy rainfall delayed construction.
This bitumen standard bypass will allow traffic to flow uninterrupted in both directions and
it will be safe for all modes of transport i.e. abnormal loads. The envisaged completion date is the end of this month.

update (31 March 2025): The RA has announced that the construction of a permanent bypass on the Windhoek-Rehoboth road is progressing well. 

update (24 March 2025): NBC Digital News reported that to restore connectivity between Windhoek and Rehoboth, the Roads Authority (RA) has constructed a temporary bypass, with a permanent dual bypass expected to be completed within three weeks. The temporary bypass is estimated to cost up to N$10 million.
Speaking to NBC News, RA Chief Executive Officer Conrad Lutombi said that the design process for a new bridge is underway, with reconstruction expected to take up to seven months.

update (24 March 2025): The West Coast Safety Initiative - Namibia announced on Facebook that chevron signs were placed at the severely damaged sections and also at Uis on the C36 route coming from the Omaruru side.

update (24 March 2025): The West Coast Safety Initiative - Namibia announced on Facebook that repair work on the C35 route between Henties and Uis started in all earnest. The last 30 kms up to Uis (from the detour) sustained significant damage because of flooding, and a grader is currently addressing the issue. This section of road is drivable but considered "rough and tough". Please adapt speed and tyre pressure accordingly. 

update (23 March 2025): The RA anticipates an increase in vehicle volume between Windhoek - Rehoboth tomorrow morning and afternoon. Due to these high traffic volumes, delays may occur during peak hours.
Hence, all road users are urged to plan their journeys accordingly, follow all traffic signs, and exercise patience to ensure smooth traffic flow, especially at the temporary one-way bypass on the Windhoek -Rehoboth road.

update (22 March 2025): The C35 route between Henties and Uis is drivable, but only with a 4x4. Roadsurface is slippery & wet, and some sections are badly damaged. There is also a lot of running water on the road itself and on the edges. (21 March 2025)

update (21 March 2025): The old B1 road (Windhoek - Okahandja) has been temporarily closed as a precautionary measure. All road users, including residents of Osona Village, are advised to use the Freeway as an alternative route.

update (21 March 2025): The Roads Authority is pleased to announce that the construction of the bypass road - following the closure of the bridge on the Windhoek-Rehoboth road - has been successfully completed and is now open for public use.

update (21 March 2025): The RA has identified two alternative routes to Rehoboth via Dordabis which are safe for public use.However, all road users are requested to exercise extreme caution when traveling on these routes.
NB: D1228 is only accessible with pick up trucks. 

(c) Roads Authortiy [src.]

update (20 March 2025): A contractor has been appointed to construct a bypass following the closure of the bridge on the Windhoek-Rehoboth road, which sustained severe damage from recent heavy rains.
As a further precaution, a section of the old B1 road between Windhoek and Okahandja (Osona Village to the interchange) will be closed before 17:00 today to ensure road users' safety. Motorists in Osona Village are advised to use the Freeway as an alternative route.

update (20 March 2025): The RA just announced that a bridge on the Windhoek-Rehoboth road (30 km from Windhoek) has been damaged due to the current heavy rainfall. Road users are advised to exercise extreme caution when approaching this area. The RA is assessing the extent of the damage.

Following recent heavy rains in Namibia, several roads across the country are damaged, flooded, or unsafe for travel. Many rivers are in full flood, making driving conditions hazardous. The Roads Authority (RA) urges all road users to exercise extreme caution and has released a list of roads that should be avoided.

If you’re traveling in Namibia, avoid these roads and use alternative routes (20 March 2025):

  • MR 76 – Uis to Kamanjab
  • D 2612 – Absa-Huab River, Sorris-Sorris to Twyfelfontein
  • M 126 – Khorixas to Bergsig
  • Palmwag to Kamanjab
  • MR 128 – Palmwag to Sesfontein
  • C 34 & C 39 – Koigab River in flood
  • C 35 & C 14 – Drive with extreme caution

Additionally, the Namibia Travel & Tourism Forum (NTTF), a discussion and information platform for the Namibian Tourism industry, has compiled a list of affected roads, rivers, lodges, and towns in Namibia due to excessive rainfall (20 March 2025). Kudos!

  • Hoaruseb River has reached the ocean again
  • Hoanib River in full flood past Khowarib
  • Uniab River has blocked access to Terrace Bay & is in full flood past Palmwag
  • Koigab River has cut off C34 & C39
  • Aba-Huab & Huab Rivers are in flood
  • Ugab River in full flood – Brandberg White Lady Lodge received 95mm in 24 hours & is now completely cut off
  • C35 is slippery & washed out
  • Omaruru River surging towards Omdel Dam
  • Swakopmund experiencing flooding
  • C14 dangerously slippery
  • Road to Waterberg is cut off due to flooding
  • Gravel roads near Otjiwarongo & Otavi are extremely slippery – high risk of skidding even at low speeds
  • Hardap & Fish Rivers in flood; Naute Dam over 50% full
  • Heavy storms around Deadvlei & Sossusvlei dunes
  • Tsauchab River & tributaries flooding again

If you’re planning a trip through Namibia, be prepared for delays and possible road closures. Stay updated by checking local travel advisories, using high-clearance vehicles for rough terrain, and avoiding river crossings during floods.

19 November 2024

Ranking: Namibia tops Africa in road quality!

The Namibian Roads Authority (RA) announced that, according to Statista, Namibia has the highest road quality infrastructure in Africa. The country reached an index rating of 5.57 on a scale from 1 (lowest) to 7 (highest) in terms of road condition and extensiveness. Egypt and Benin followed with a score of 5.53 and five, respectively. South Africa has the continent's 10th highest road quality infrastructure with a score of 3.97.
Namibia boasts an extensive road network, spanning over 48,875 km (2017). 6,664 km are standard bitumen roads, 412 km are low-volume bitumen roads, and the rest are gravel. Major highways include the A1 freeway between Windhoek and Okahandja (74 km) and the B1 highway (1,522 km), which runs from the northern border with Angola at Oshikango to the southern border with South Africa at Noordoewer.

Statista is a global data and business intelligence platform with extensive statistics, reports, and insights on over 80,000 topics from 22,500 sources in 170 industries.

04 November 2024

Etosha National Park: Condition of roads is being addressed as matter of urgency!

The Namibian Ministry of Environment, Forestry and Tourism has announced on 29 October 2024 that the condition of roads in the Etosha National Park is being addressed as matter of urgency. According to the Ministry, the deterioration of the road between Okaukuejo and Namutoni, for instance, is impacted by large traffic volumes. This leads to loss of gravel, severe corrugations, pottholes and drainage problems. As an immediate remedy, three graders have been deployed to blade the roads between Halali and Namutoni, Okaukuejo and Halali as well as between Namutoni and King Nehale Gate. The Ministry anticipates that this intervention will improve the road condition in the specified sections within a period of two weeks. Furthermore, the roads from Okaukuejo, Halali, Namutoni to King Nehale Gate will soon be upgraded from gravel to low-seal volume (tarred road).

While the road situation in Etosha National Park is being addressed, the Ministry encourages visitors to consider alternative routes from Okaukuejo to Halali via Gemsbokvlagte, Olifantsbad and Aus for a better travel experience.

Since 2018, the Ministry of Environment, Forestry and Tourism has succesfully rehabilitated the western section of the tourist road between Okaukuejo and Galton Gate, completing over 200 kilometers of road upgrade by March 2024.

28 February 2022

Namibia: Update on the road conditions in the Kunene Region & the Kharas Region! [update]

update (14 March 2022): Namibia's Roads Authority (RA) has announced that the road between Aus and Rosh Pinah has been cleared and it is passable to all vehicles.

Namibia's Roads Authority (RA), whose core business is to construct and maintain the country's road sector, has released an update on the road conditions in the Kunene Region in north-western Namibia and the Kharas Region in southern Namibia. Both Regions were affected by recent heavy rains. The RA monitors all the affected roads; maintenance teams are on standby to ensure that damaged roads are repaired, where possible, within a reasonable time period.

Kunene Region:

  • MR76 ((Uis <> Khorixas)
    The RA has commenced with repair works on the Ugab bridge. Currently, the Ugab River and the road is passable with 4x4 Vehicles only.
  • DR 2612 Twyfelfontein area
    Road damages/wash-aways have been repaired. The road on the southern side of the Aba-Huab river is passable by all vehicles, whilst the road on the northern side of the Aba-Huab River is only passable with 4x4 vehicles. The section between the Aba-Huab River and the Twyfelfontein turn off has been repaired and is now accessible with all vehicles.  
  • MR128 (Palmwag <> Sesfontein)
    The Skelm River is flooding, thus no vehicles can pass through. The Skelm River Bridge has been closed, however repair works have commenced. The rest of the road is passable with all vehicles.
  • MR126
    Road damages/wash-aways between Khorixas and Palmwag were repaired and the road is now passable with all vehicles. However, due to restricted river crossings, the road between Kamanjab and Palmwag is only passable with 4x4 vehicles. The section at Langasem Pass will be repaired in due course.
  • DR2302 (Terrace Bay area)
    Repair works are in progress and the road is passable with 4x4 vehicles only.
  • DR 2628
    The road is closed at Unib River to all traffic.

Kharas Region:

  • DR212 (Aussenkehr <> Rosh Pinah)
    The road is still closed to all traffic.
  • MR118 (Rosh Pinah <> Oranjemund)
    The road is open to traffic and the RA is currently attending to the road shoulders. However, the public is kindly requested to strictly adhere to the erected road signs on this road at all times.  
  • DR 463 (turn off at TR/1 from Keetmanshoop towards Lüderitz)
    The road is open to traffic, however, the public is kindly requested to drive with caution as road repairs are being carried out on the road.  
  • TR 4/1 (Keetmanshoop to Goageb)
    Road damages/wash aways were repaired and the road is open to traffic.

04 January 2022

Namibia: Rosh Pinah <> Aussenkehr road closed until further notice!

Namibia's Road Authority (RA), whose core business is to construct and maintain the country's road sector, has announced that a section on the Rosh Pinah <> Aussenkehr road (DR212) will be closed from today, 04 January 2022, until further notice. This road is currently experiencing flooding and the water levels at that particular section (Fish River Crossing/Bridge) have exceeded the maximum height. The RA advises to make use of the Keetmanshoop <> Aus <> Rosh Pinah route until the water levels have subsided and road is deemed safe to motorists. We'll keep you posted!


05 March 2021

Namibia: The Roads Authority has released an update on the conditions of roads in north eastern Namibia!

Namibia's Road Authority (RA), whose core business is to construct and maintain the country's road sector, has released an update on the status/condition of roads in Kavango West, Kavango East and the Zambezi Region in the north eastern part of Namibia (as of 05 March 2021):

Kavango East:

  • TR08/4 Rundu - Divundu Road
    • There are severe scattered potholes on the entire road. Three Bitumen Maintenance Units are currently repairing the damaged sections when the weather permits. The RA has also erected warning signs at critical places to alert motorist on the damage.
    • As a long-term strategy, this road will be rehabilitated to mitigate future damages during rainy seasons. Should funds permit, rehabilitation will commence after the rainy season has ended.

Kavango West:

  • District Road DR3476 - Mavatje from kilometre 3.1 to 4
    • A bypass was done at the affected area and warning signs were erected on both sides. In addition, a number of culverts will be installed at the different sections.

Zambezi Region:

  • Katima Mulilo
    • Some sections on the following roads are damaged:
      • District Road DR3507 (between Muyako and TR8/7 Ngoma)
      • District Road DR3510 (End of surface in Bukalo to DR3512 Lusese)
      • District Road DR3512 (TR8/7 Ikumwe to DR3510 Lusese)
      • District Road DR3514 (MR125 Mwambezi to Zilitene)
      • District Road DR3532 (DR3507 to Ibbu Combined School)
      • District Road DR3533 (DR3507 to Mutikitila Primary School)
      • District Road DR3535 (DR3507 to Isuswa Primary School)