- S25 (From S26 to S139, Biyamiti Low Level Bridge inaccessible): Temporary access planned to open end September 2012.
- S33, S84
- Balule Low Level Bridge (detour via S89 and S90): Balule Bridge is expected to reopen by 15 November 2012.
- H1-5 (From S91 to H8) (detour via S91, S92 & H8 – detour 17km of which 12km is gravel road): Breach on H1-5 near N’wamanzi is expected to reopen by 30 September 2012
Welcome to the official blog of TravelComments.com - travelling Southern Africa!
06 September 2012
South Africa: Kruger National Park flood repair update
South Africa's Kruger National Park experienced heavy floodings in January 2012 caused by strong rainfall in the area. Some of the parks camps and picnic sites, as well as roads and low level bridges, got damaged by the water masses and had to be temporarily closed. Flood repairs are still underway in Kruger National Park, but in the meantime all camps and picnic spots are open again. Except for the following, all roads are also open again:
Labels:
africa,
flooding,
floods,
Kruger National Park,
south africa,
tourism,
travel
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment